Sudan 300–350 TPH Gold Ore Crushing Plant
MORE
Project Overview
Main Equipment:
The mobile gold ore crushing walks independently, requiring no fixed civil construction. It can transfer between multiple scattered mining sites, adapting to the decentralized mining pattern of small and medium gold mines in Ghana.
The mobile gold ore crushing is fully assembled before delivery, ready for production right after arrival, skipping civil construction cycles and helping the client seize the mining right window quickly.
The crawler chassis delivers excellent trafficability, operating in mountainous and forested mining areas without hardened roads, fitting the terrain conditions of Ghanaian mining sites.
The customer is a medium-sized local mining company in Ghana with multiple scattered rock gold mining rights. The mining sites are far apart with complex terrain, making fixed crushing plants high in civil cost and long in construction. The client needed a flexible mobile gold ore crusher to meet primary crushing demands at different sites, and finally selected our mobile gold ore crushing plant solution.
Mobile gold ore crushing plant commissioned and put into operation within 3 days of arrival on-site. A single unit covers primary crushing at 3 scattered mining sites, with stable discharge size fully matching the feed requirements of the downstream gold processing plant. Compared with fixed solutions, the customer's overall civil investment is reduced by 60%, and site transfer takes only 1 day, greatly improving mining efficiency and equipment utilization.