Zimbabwe 120 TPD CIP Gold Processing Plant
MORE
Project Overview
Main Equipment:
Gold leaching and adsorption proceed simultaneously in the same tank. The short flow and streamlined equipment layout reduce the footprint for civil construction.
Dissolved gold is captured by activated carbon immediately upon leaching, limiting re-deposition of soluble gold for stable gold recovery and maximized ore value.
Customized training materials are provided to guide the client on key CIL parameter adjustments, enabling their team to independently operate the whole plant.
The Canadian customer owns a gold mine. Located in a remote area, the site faces high labour costs, limited processing technicians and strict environmental rules. The customer is building a processing plant for the first time and looking for a CIL gold production line with stable operation, easy maintenance and compliance with local regulations.
"We are satisfied with this CIL gold plant. It runs steadily after commissioning. The main equipment has low failure rate and easy maintenance, with accessible spare parts that reduce our upkeep costs. We greatly appreciate all-round support from FTM and look forward to our continued good cooperation."