Canada 8 TPH CIL Gold Processing Plant
MORE
Project Overview
Main Equipment:
Two-stage jaw crushing + closed-circuit ball milling fully liberates fine gold grains locked in quartz gangue, creating ideal particle size for subsequent cyanide leaching.
Multi-stage carbon-in-pulp leaching and active carbon adsorption maximize gold extraction from slurry, driving total gold recovery beyond 90%.
Custom diesel generator set adapts to remote Zimbabwe mine sites. It supports 24-hour continuous slurry stirring and leaching, free from unstable local grid power.
A gold mining company in Mashonaland, Zimbabwe, wanted to upgrade its plant to get higher gold recovery than simple gravity separation. To produce gold sludge directly on site, the client chose FTM Machinery's complete 120 TPD CIP plant, covering crushing, grinding, leaching, carbon adsorption, and electrowinning.
The plant reached full design capacity within 4 weeks after installation. With stable gold recovery over 90%, the client recovered all investment on equipment in only 6 months.